NCC fire safety compliance ready for certification.

Check fire and services designs against the National Construction Code and the Australian Standards it references — including the changes in NCC 2025 — before you go to your building certifier.

Codes and standards in Australia

How building approval works

Planning approval (a DA or a complying development certificate) is followed by building certification against the NCC.

  1. Planning approval: A development application (DA) or, where eligible, a complying development certificate (CDC).
  2. Fire safety design: Show compliance through Deemed-to-Satisfy provisions, a Performance Solution, or a combination.
  3. Building certification: A registered building certifier or surveyor assesses the design against the NCC and issues the construction approval.
  4. Occupation: Inspections, fire system commissioning and the occupation certificate.

What Verify AI checks

Frequently asked questions

Is NCC 2025 in force?

NCC 2025 was released by the ABCB on 1 May 2026. Each state and territory decides when to adopt it, so check whether your project is assessed under NCC 2025 or NCC 2022.

What changed for fire safety in NCC 2025?

Changes include stronger fire safety for carparks, with sprinkler protection required for open-deck carparks (except stand-alone open decks), fewer concessions to fire-resistance levels, and clearer means of assessment for Performance Solutions.

Can Verify AI help with Performance Solutions?

Verify AI checks designs against Deemed-to-Satisfy provisions and flags where a design departs from them, which helps you scope a Performance Solution. The fire engineering analysis itself remains with your fire safety engineer.