Fire safety compliance for ERP and IGH projects.

Check designs against the French fire safety rules for buildings open to the public (ERP), high-rise buildings (IGH) and housing — before the file goes to the commission de sécurité.

Codes and standards in France

How fire safety approval works

For ERP and IGH, fire safety is reviewed with the building permit and again before opening, with the commission de sécurité playing a central role.

  1. Classify the building: Determine the ERP type and category, IGH class or residential family — this sets the applicable rules.
  2. Permit and fire safety file: Submit the fire safety notice with the building permit or works authorisation for review.
  3. Construction and verification: Build to the approved design, with checks by a technical inspection body (contrôleur technique).
  4. Commission de sécurité visit: For ERP and IGH, a safety commission visit before opening; the mayor authorises opening.

What Verify AI checks

Frequently asked questions

What is an ERP?

An établissement recevant du public (ERP) is a building open to the public, such as a shop, school, hotel or office open to visitors. ERPs are classified by type and category, which decides the fire safety rules that apply.

Do the Eurocodes apply to fire safety in France?

The Eurocodes cover structural fire design, such as how long the structure resists fire. Occupancy-specific rules such as exits, alarms and smoke extraction come from the French regulations for ERP, IGH and housing.

Is the platform available in French?

The Verify AI interface and reports are currently in English. Checks reference the French regulations your project is subject to.

What files can I upload?

IFC (2x3 and IFC4), DXF and PDF drawings exported from Revit, ArchiCAD, Bentley, Tekla or AutoCAD.

Try Verify AI · Talk to the founder