Automated Fire & MEP Building Code Compliance Solutions

Verify AI automates building plan pre-checks on architectural CAD and BIM models against NBC 2016/2026 Part 4/Part F, UAE Fire Code, and NFPA standards before municipal submission.

BIM Fire & Life Safety Compliance

Detect egress hazards, excessive travel distance, dead-end corridors, missing refuge areas, and fire door rating gaps before statutory review.

  • Automated shortest walking path travel distance calculations (not diagonal straight lines).
  • Staircase width, riser/tread compliance, and occupant load capacity checks.
  • Fire compartmentation integrity auditing and fire door rating validation in BIM models.
  • Fire tender access road width and turning radius clearance.

Electrical & Fire Hazard Prevention

Identify service routing conflicts, electrical riser separation hazards, and substation clearance violations before sign-off.

  • Shaft containment and separation checks between HV/LV electrical risers and wet services.
  • Transformer, DG room, and electrical switchgear clearances per NBC Part 8.

HVAC, Smoke Control & Penetration Safety

Catch missing motorized fire dampers where ducts penetrate fire-rated partitions and ensure smoke management compliance.

  • Service penetration fire safety: verify fire damper placement at compartment boundaries.
  • Staircase and elevator shaft pressurization system checks.

Supported Formats & Standards

Inputs: openBIM IFC 2x3 & IFC4, AutoCAD DWG/DXF, PDF drawings. Standards: NBC 2016 Part 4, NBCS 2026 (SP 7:2026 Part F), UAE Fire Code 2018, NFPA 101, NFPA 13, NFPA 72.

Try Verify AI Free ยท Book a 15-Minute Walkthrough