Pre-check your drawings before Abu Dhabi Civil Defence reviews them.
Abu Dhabi Civil Defence reviews initial and shop drawings for fire and life safety features. This page explains the review and how to catch issues first.
How the review works
Abu Dhabi Civil Defence reviews fire and life safety drawings at initial and shop-drawing stages, with a cycle of review, revision and approval. Consultancy guides describe submission requirements around the number of drawings, the level of content and the format following the authority's guidelines, and the use of the authority's standard legend symbols.
These descriptions come from consultant guides, so confirm the current procedure and drawing requirements on the authority's official channels.
Codes involved
- The UAE Fire and Life Safety Code of Practice is cited as the reference for technical fire and life safety requirements.
- The Abu Dhabi International Building Code was developed from the International Building Code under a 2009 agreement with the International Code Council. Check the current edition.
- Life-safety and fire-fighting equipment is expected to be listed, approved and registered with the authority's material approval process.
What to pre-check
- Egress: exits, travel distance, stair widths.
- Compartmentation: rated walls, doors, shafts and penetrations.
- Systems: detection, alarm, suppression, smoke control.
- Drawing set: legend symbols, drawing content and format as the authority requires.
Frequently asked questions
What does Abu Dhabi Civil Defence review?
Fire and life safety features in initial and shop drawings: egress, separation, detection and suppression, smoke control and the equipment used.
Does Abu Dhabi use the same code as Dubai?
Both reference the UAE Fire and Life Safety Code of Practice. Each emirate has its own building code and authority procedures, so confirm which apply to your project.
Does Verify AI replace the authority's review?
No. It is a pre-check that finds issues early. The authority makes the approval decision.