NBCS 2026 Part F Checklist for Architects: What to Check in Your Fire Drawings

· 4 min read · By Verify AI

If you used to look up NBC Part 4 for fire and life safety, the equivalent in NBCS 2026 (SP 7:2026) is Part F, Fire and Life Safety. The subject is the same: means of egress, fire protection systems, compartmentation. The clause numbers are not, so a checklist keyed to your old references will mislead you. This one is organised by the design decisions that changed or that reviewers still focus on.

Use it as a review aid. What is mandatory for your project depends on what your state has adopted. See NBC vs NBCS 2026: which applies.

1. Set the basis of design

  • Record the edition you are designing to and the authority that applies it.
  • Note the high-rise threshold your authority uses. The national figure moved from 15 m to 24 m, but states may keep a lower one.
  • If any element follows a performance-based route, list the test reports or engineering analysis that support it.

2. Egress

  • Exits are sufficient in number and well placed for the occupancy and floor area.
  • Travel distance is measured along the walking path, not in a straight line. See travel distance vs straight-line distance.
  • Dead-end corridors are within the permitted length.
  • Exit widths match the calculated occupant load.
  • Every exit leads to a final exit or protected discharge.

3. Staircases, refuge and lifts

  • Stair clear width, enclosure rating and self-closing doors are shown.
  • Refuge areas and fire lifts are provided where the height calls for them.
  • For buildings near a threshold, check both the national figure and the local one.

4. Fire doors as certified assemblies

NBCS 2026 guidance moves toward fire doors that are evaluated as a complete assembly (frame, leaf, hardware and intumescent seals from an accredited manufacturer), away from uncertified metal doors.

  • Door schedules state the rating and that the door is a certified assembly.
  • Door ratings match the walls and enclosures they sit in.
  • Keep the manufacturer's test evidence for the submission. See fire door rating validation in BIM.

5. Passive fire stops and service penetrations

Pipe, duct and cable tray penetrations through fire-rated compartment walls are expected to be sealed with tested fire-stop systems certified to IS 12458:2019.

6. EV charging in basements and podiums

The updated standards call for dedicated fire isolation and enhanced automatic sprinkler density (minimum CL-5 classification) for basement and podium EV charging zones.

  • Show the EV zones and their separation from other areas.
  • Confirm the sprinkler design basis for those zones with your fire engineer.

7. Active systems and smoke control

  • Sprinkler coverage, hydrants, wet risers and pump provisions match the design demand.
  • Alarm, detection and public address are shown.
  • Stair and lift-lobby pressurisation, basement smoke extraction and dampers are coordinated across architecture and HVAC.

8. Evidence and documents

  • Occupant load and egress calculations are included.
  • Test reports for certified assemblies and fire-stops are filed.
  • The drawings are consistent across sheets and schedules.

Frequently asked questions

What replaced NBC Part 4 in NBCS 2026?

Part F, Fire and Life Safety. Clause numbers do not map one-to-one, so cite the edition and clause you designed to.

Do I have to follow Part F?

Its fire provisions are guidance for states. What binds your project is what your state and local authority have adopted into their rules.

What is IS 12458:2019?

The Indian Standard referenced by NBCS 2026 guidance for tested fire-stop systems in service penetrations through fire-rated compartment walls.

What changed for EV charging areas?

Basement and podium EV charging zones call for dedicated fire isolation and enhanced sprinkler density, with a minimum CL-5 classification.

Run the checklist automatically

Verify AI checks IFC, DXF and PDF drawings against NBC and NBCS 2026 and cites the clause for each finding. Download the NBC 2016 to NBCS 2026 transition reference, or talk to the founder.

Sources

General information as of November 2026, not legal advice. Check the standard itself and your authority's adoption.

← All articles · Try Verify AI