What to know first about the Telangana fire NOC
Fire services in Telangana are handled by the Telangana State Disaster Response and Fire Services Department. Thresholds, fees and portals change, and several published guides disagree, so each point below is marked as reported where it comes from a secondary source.
- The state fire department portal is fire.telangana.gov.in, which handles NOC and occupancy NOC applications.
- Reported: the portal lists different processing times for buildings above 15 metres and for buildings up to 15 metres, with the shorter time for the smaller buildings. Check the current timelines.
- Reported: the Telangana Fire Services Act 1999 is the governing Act.
- Building permission goes through the state single-window system; the fire NOC is a linked step.
Where to apply
- Telangana fire services portal: fire.telangana.gov.in.
- Telangana single-window building permission system (TS-bPASS) for the linked building approval.
Which code edition applies
India replaced NBC 2016 with NBCS 2026 (SP 7:2026) on 30 April 2026, and the fire provisions moved from Part 4 to Part F as guidance for states. What is mandatory in your project depends on what the state has adopted. Read NBC 2026 explained, and write the edition you designed to on every drawing.
Drawings and documents to prepare
- Key site plan with surrounding roads, fire tender driveway and gates.
- Floor plans with exits, staircases, walking paths, refuge areas and fire lifts marked.
- Fire-fighting layout: wet risers, hydrants, sprinklers, manual call points, detectors.
- Pump room and water storage schedule.
- Occupant load and egress calculations.
- For the final certificate: installation and testing certificates for the fire systems.
Get the one-page version: the fire NOC pre-submission checklist.
Common reasons applications are sent back
- Exit widths that do not match the calculated occupant load.
- Travel distance measured in a straight line rather than along the walking path.
- Missing staircases, refuge areas or fire lifts where the building height requires them.
- Fire tender access that is too narrow or has tight turns.
- Drawings that are inconsistent between sheets.
Frequently asked questions
Who issues the fire NOC in Telangana?
the Telangana State Disaster Response and Fire Services Department. Confirm the current process on the official portal before you file.
Do I need both a provisional and a final fire NOC?
Most states issue a provisional certificate at plan stage and a final one after the fire systems are installed and tested, and the final one is typically needed before occupation. Confirm the exact certificates your project needs with the authority.
Can Verify AI pre-check drawings for this state?
Yes. Verify AI checks IFC, DXF and PDF drawings against NBC and NBCS 2026 requirements and records the edition and clause in each finding. It is a pre-check, not an approval.