Clearance zone checking keeps the way out clear.
Clearance zone checking finds objects blocking exit routes, door swings, electrical panels and fire equipment in a BIM model, so working and escape space stays clear.
What is clearance zone checking?
Clearance zone checking looks at the space around things that must stay accessible: exit doors, escape routes, electrical panels, fire hydrants and fire equipment. It finds furniture, equipment, planters or door swings that intrude into the required space, which are the kind of issues that are obvious on site and easy to miss on a 2D plan.
What the code asks for
- Exit routes keep their required clear width and are not narrowed by objects or door swings.
- Doors on exit routes can open in the direction required without reducing the clear width.
- Electrical panels and switchgear keep the working space the electrical standard requires (for example IEC 60364 or the local equivalent).
- Fire equipment such as hydrants, hose reels and extinguishers stays reachable.
The exact values (ratings, distances, widths, densities) come from the code edition your authority applies, so a check always reports which edition and clause it used.
How it shows up in an IFC model
| Item | IFC entity | What a check reads |
|---|---|---|
| Exit route | IfcSpace, IfcDoor, IfcStair | The path and its clear width |
| Door swing | IfcDoor operation type and geometry | Swing arc and what it intrudes into |
| Furniture and equipment | IfcFurnishingElement, equipment classes | Objects inside a clearance zone |
| Electrical panel | IfcElectricDistributionBoard | Working space in front of the panel |
| Fire equipment | IfcFireSuppressionTerminal and related classes | Access space around equipment |
Why models fail this check
- Furniture or equipment placed in a corridor that is also an exit route.
- Doors swinging into an exit path or reducing stair landing width.
- Electrical panels placed in narrow corridors or behind other equipment.
- Equipment from different disciplines modelled in the same space.
- Clearance not modelled at all, so the issue only shows on site.
What a Verify AI finding looks like
Example finding: panel clearance
Severity: MEDIUM
Element: IfcElectricDistributionBoard "DB-L2-03"
Location: Level 2, service corridor
Detected: working space in front of the panel is intruded by a duct
Requirement: clear working space per the applicable electrical standard
Action: relocate the duct or the panel to restore clearance
This is an illustrative example. Every finding is pinned to the plan, names the element, and cites the clause it was checked against. See a full sample report.
How to prepare your model
- Model the real position: include furniture, equipment and door swings that affect clearance.
- Federate the disciplines: review architecture, MEP and fit-out together.
- Tag the zones: mark exit routes and panel spaces so they can be checked.
- Review swings: check each door on an escape route.
- Fix and re-run: move the object, not the zone.
Frequently asked questions
What is a clearance zone?
The space that must be kept free around something: an exit, a panel, a hydrant or an escape route.
Which standard sets panel working space?
It depends on the project: IEC 60364 or the national electrical code the project follows. The check cites the standard it used.
Does this cover furniture layouts?
If the furniture is modelled, yes. If it is not in the model, a clearance check can only report on what is there.