Clearance zone checking keeps the way out clear.

Clearance zone checking finds objects blocking exit routes, door swings, electrical panels and fire equipment in a BIM model, so working and escape space stays clear.

What is clearance zone checking?

Clearance zone checking looks at the space around things that must stay accessible: exit doors, escape routes, electrical panels, fire hydrants and fire equipment. It finds furniture, equipment, planters or door swings that intrude into the required space, which are the kind of issues that are obvious on site and easy to miss on a 2D plan.

What the code asks for

The exact values (ratings, distances, widths, densities) come from the code edition your authority applies, so a check always reports which edition and clause it used.

How it shows up in an IFC model

ItemIFC entityWhat a check reads
Exit routeIfcSpace, IfcDoor, IfcStairThe path and its clear width
Door swingIfcDoor operation type and geometrySwing arc and what it intrudes into
Furniture and equipmentIfcFurnishingElement, equipment classesObjects inside a clearance zone
Electrical panelIfcElectricDistributionBoardWorking space in front of the panel
Fire equipmentIfcFireSuppressionTerminal and related classesAccess space around equipment

Why models fail this check

What a Verify AI finding looks like

Example finding: panel clearance

Severity: MEDIUM

Element: IfcElectricDistributionBoard "DB-L2-03"

Location: Level 2, service corridor

Detected: working space in front of the panel is intruded by a duct

Requirement: clear working space per the applicable electrical standard

Action: relocate the duct or the panel to restore clearance

This is an illustrative example. Every finding is pinned to the plan, names the element, and cites the clause it was checked against. See a full sample report.

How to prepare your model

  1. Model the real position: include furniture, equipment and door swings that affect clearance.
  2. Federate the disciplines: review architecture, MEP and fit-out together.
  3. Tag the zones: mark exit routes and panel spaces so they can be checked.
  4. Review swings: check each door on an escape route.
  5. Fix and re-run: move the object, not the zone.

Frequently asked questions

What is a clearance zone?

The space that must be kept free around something: an exit, a panel, a hydrant or an escape route.

Which standard sets panel working space?

It depends on the project: IEC 60364 or the national electrical code the project follows. The check cites the standard it used.

Does this cover furniture layouts?

If the furniture is modelled, yes. If it is not in the model, a clearance check can only report on what is there.