BIM fire compliance checking, before you submit.
Check an IFC model against fire and life safety rules, and get each finding pinned to the plan with the clause it was checked against. This guide covers what is checked, how it works and how to prepare your model.
What is BIM fire compliance checking?
BIM fire compliance checking is an automated review of a building model against fire and life safety requirements. Because an IFC model describes what each object is (a door, a wall, a stair) and its properties (such as fire rating), a rule engine can test it directly, instead of a person reading drawing sheets one at a time.
It does not replace a fire consultant. It makes the review shorter by finding mechanical, repeatable issues first, so people spend their time on judgement calls. Read our walkthrough: how to check an IFC model for building code compliance.
What gets checked
| Check | What it finds | Guide |
|---|---|---|
| Model health | Unbounded spaces, proxies, storeys, units, missing properties | IFC model health check |
| Classification | Elements that cannot be recognised by rules | IFC classification checking |
| Fire doors | Missing or low ratings, mismatch with the wall | Fire door rating validation |
| Compartmentation | Gaps in fire walls, shafts not enclosed | Fire wall continuity |
| Penetrations | Ducts and pipes through rated walls with no damper or fire-stop | Service penetrations |
| Egress | Walking-path distance, dead ends | Travel distance |
| Clearances | Blocked exits, panel space, door swings | Clearance zones |
| Smoke control | Stair pressurisation fans, ducts, relief | Stair pressurisation |
| Emergency power and lighting | Escape route lighting and supply | Emergency lighting |
| Suppression | Sprinkler coverage, spacing, obstructions | Sprinkler coverage |
How it works
- Upload your model or drawings: Drag and drop a coordinated IFC (IFC2x3 or IFC4) or a Revit-exported model. DXF and PDF drawings are supported too.
- Fire and MEP systems are detected: Fire zones, doors, stairs, sprinklers, ducts, panels and plumbing networks are identified across the model.
- Rules are applied for your jurisdiction: Checks run against the framework you select (for example NBC / NBCS, NFPA, UAE Fire Code, SBC 801, SCDF, BS 9999), with the edition and clause recorded for each finding.
- You get a report with overlays: Findings are pinned to the plan, ranked by priority, with suggested fixes, so the team can resolve and re-check.
A workflow that works on real projects
- Agree the basis of design with the authority: which code edition and which state rules apply.
- Health-check the model before any rules, and fix the structural problems it finds.
- Run the compliance check on each model update, not only at the end.
- Resolve findings in the authoring tool and re-export. Findings are tracked in BCF where your team uses it.
- Keep an evidence trail of test reports and design decisions, especially for performance-based choices.
- Have a qualified fire consultant review the final package before submission.
What automated checking cannot do
- It cannot judge a performance-based fire engineering strategy. It can check that the evidence is attached.
- It reads what is in the model. If an object is not modelled, a check cannot find it.
- It does not certify products. Test evidence for doors, dampers and fire-stops comes from manufacturers.
- Requirements differ by authority. The report states the edition used; confirm it matches what your authority applies.
Frequently asked questions
What is BIM fire compliance checking?
Automated testing of a building model against fire and life safety rules, using the object types and properties in an IFC file, so issues are found before submission.
Which IFC versions does Verify AI read?
IFC2x3 and IFC4, including coordinated models exported from Revit. Verify AI also reads DXF and PDF drawings.
Does it work for Indian, UAE and UK codes?
Verify AI is jurisdiction-aware and references frameworks such as NBC and NBCS 2026, NFPA, the UAE Fire Code, SBC 801, SCDF and BS 9999, with the edition recorded in each finding.
Will it replace my fire consultant?
No. It finds repeatable issues quickly so the consultant's time goes to judgement. A qualified person still reviews and signs the submission.
How do I prepare a model?
Start with a model health check: bound spaces, classify elements, set storeys, check units and export common property sets. The IFC validation matrix is a one-page checklist.