Fire wall continuity checking finds gaps in compartment walls: walls that stop at a ceiling, openings without rated closures and shafts that are not enclosed to the slab above.

What is fire wall continuity check?

A fire wall is only as good as its weakest point. Fire wall continuity checking follows each rated wall and compartment boundary through the model and flags where it breaks: a wall that stops at a suspended ceiling instead of reaching the slab, a shaft that is not closed at the top, or an opening in the wall with no rated closure.

What the code asks for

The exact values (ratings, distances, widths, densities) come from the code edition your authority applies, so a check always reports which edition and clause it used.

How it shows up in an IFC model

ItemIFC entity or propertyWhat a check reads
Rating of the wallPset_WallCommon.FireRating on IfcWallWhich walls are fire barriers
Compartment rolePset_WallCommon.CompartmentationWhether the wall is designed as a fire compartment boundary
Wall extentWall geometry and storey heightWhether the wall reaches the slab above
Slabs and shaftsIfcSlab, openings in slabsVertical continuity and slab openings
OpeningsIfcOpeningElement, IfcDoor, IfcWindowClosures in the barrier and their rating

Why models fail this check

What a Verify AI finding looks like

Example finding: compartment wall stops at ceiling

Severity: HIGH

Element: IfcWall (FireRating recorded)

Location: Level 4, corridor compartment line

Detected: wall top is below the underside of the slab above

Impact: compartment boundary is not continuous

Action: extend the wall to the slab and fire-stop the head of wall

This is an illustrative example. Every finding is pinned to the plan, names the element, and cites the clause it was checked against. See a full sample report.

How to prepare your model

  1. Mark the barriers: set FireRating on every wall that forms a compartment boundary.
  2. Extend to the slab: model rated walls up to the structure above.
  3. Close the shafts: check shaft walls along their full height.
  4. Rate the openings: assign ratings to doors and glazing in rated walls.
  5. Review the plan: compare the model with the fire strategy drawing.

Frequently asked questions

What is fire compartmentation?

Dividing a building into fire-resistant cells so a fire and its smoke stay in one area long enough for people to leave and for firefighters to act.

Why do walls stop at the ceiling in models?

Because walls are often drawn to the finished ceiling height. Rated walls usually need to continue to the slab above, so the model has to show that.

Does the check replace a fire engineer's review?

No. It finds geometric and data gaps quickly. A qualified fire consultant remains responsible for the strategy and the submission.